(don't forget you can click on the pics to make them bigger.)

...began to frame up a deck...


...and started laying the flooring. I decided to lay the flooring on a 45 degree angle so that it wouldn't look so much like an afterthought as it transitioned from the old porch structure. I think once it's all stained the same color it will look like it was always there.


Next step was to trim off all the uneven boards and start on the railing.

The bride picked out the style of railing she wanted, and it was up to me to figure out how to make it work...


I think it looks pretty good.

Now it's time to relax...

Uh oh, the bride has informed me that this is phase I of the deck construction. Phase II will be a lower level deck... sheesh, it never ends. Stay tuned.